IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0927 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,141 $1,725,000 Not Implemented
GT0927 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,352 $6,398 Implemented
GT0927 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $62,369 $548,847 Not Implemented
GT0927 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,382 $27,983 Implemented
GT0927 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,930 $2,500 Implemented
GT0927 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $32,534 $4,145 Implemented
GT0922 # 01 Y:2019 01 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $8,082 $1,200 Implemented
GT0922 # 05 Y:2019 05 2019 PAY BILLS ON TIME TO AVOID LATE FEES $281 $1,190 Implemented
GT0922 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,284 $79,761 Implemented
GT0922 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,604 $3,500 Implemented
GT0922 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,827 $1,175 Implemented
GT0898 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,203 $150 Not Implemented
GT0898 # 02 Y:2017 02 2017 METER WASTE WATER $38,607 $18,000 Implemented
GT0898 # 05 Y:2017 05 2017 USE SOLAR HEAT FOR HEAT $42,901 $150,153 Not Implemented
GT0898 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,223 $8,011 Not Implemented
GT0898 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,648 $9,390 Implemented
GT0891 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $304 $0 Not Implemented
GT0891 # 01 Y:2012 01 2012 USE SYNTHETIC LUBRICANT $14,552 $0 Not Implemented
GT0891 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $625 $25,217 Implemented
GT0891 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $610 $225 Not Implemented
GT0891 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $34,362 $25,440 Implemented
GT0891 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,301 $12,500 Not Implemented
GT0891 # 08 Y:2012 08 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,990 $12,300 Not Implemented
GT0891 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,852 $88,000 Implemented
GT0891 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,720 $20,395 Not Implemented