IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1049 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $820 Implemented
OK1049 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $0 Implemented
OK1049 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,601 $1,060 Implemented
OK1042 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $0 Implemented
OK0981 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $124,716 $75,000 Implemented
OK0898 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,132 $1,689 Implemented
OK0898 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $303 $270 Implemented
OK0898 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $463 Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0839 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $12,090 $11,638 Implemented
OK0839 # 11 Y:2013 11 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,511 $25,606 Implemented
OK0839 # 09 Y:2013 09 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $873 $490 Implemented
OK0839 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,708 $5,684 Implemented
OK0839 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,494 $33,218 Implemented
OK0839 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,395 $1,750 Implemented
OK0839 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,540 $0 Implemented
OK0839 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,514 $27,500 Implemented
OK0769 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,911 $4,475 Implemented
OK0769 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $1,922 Implemented
OK0717 # 05 Y:2005 05 2005 DEVELOP A REPAIR/REPLACE POLICY $1,002 $9,712 Implemented
OK0717 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,466 $1,039 Implemented
OK0717 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,551 $53,370 Implemented