Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
169
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0546 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $626 | $0 | n/a |
SU0546 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,466 | $100 | n/a |
SU0546 # 04 Y:2023 | 04 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $559 | $253 | n/a |
SU0546 # 01 Y:2023 | 01 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,882 | $0 | n/a |
UW2317 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2317 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $533 | $0 | Implemented |
UW2317 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $156 | $1,901 | Implemented |
UW2317 # 04 Y:2023 | 04 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $31,756 | $1,000,000 | Implemented |
UW2317 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $658 | $1,096 | Implemented |
UW2315 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,189 | $1,896 | Implemented |
UW2315 # 02 Y:2023 | 02 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | Implemented |
UW2315 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,343 | $10,879 | Not Implemented |
UF0601 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,858,540 | $0 | Not Implemented |
UF0601 # 03 Y:2023 | 03 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $280,640 | $30,000 | Implemented |
UF0601 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,983 | $0 | Implemented |
UF0601 # 07 Y:2023 | 07 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $61,813 | $29,295 | Implemented |
UF0601 # 06 Y:2023 | 06 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $74,558 | $0 | Implemented |
UF0601 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,202,647 | $3,920,000 | Implemented |
UF0601 # 08 Y:2023 | 08 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,014 | $3,179 | Implemented |
UF0601 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $32,141 | $49,680 | Implemented |
OR0774 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,206 | $88,913 | Not Implemented |
OR0774 # 02 Y:2023 | 02 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $22,803 | $17,436 | Not Implemented |
OR0774 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $10,951 | $10,710 | Not Implemented |
OR0774 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,255 | $1,480 | Not Implemented |
CM1022 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,609 | $32,760 | Not Implemented |