Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
228
matching recommendationsNAICS | 32711 | Pottery, Ceramics, and Plumbing Fixture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0292 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,577 | $0 | Not Implemented |
SU0292 # 02 Y:2010 | 02 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $4,309 | $46 | Implemented |
SU0292 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,292 | $962 | Implemented |
SU0292 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,754 | $5,714 | Not Implemented |
SU0292 # 05 Y:2010 | 05 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $274 | $560 | Not Implemented |
SU0292 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,377 | $81,156 | Not Implemented |
SU0292 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $57,316 | $175,000 | Not Implemented |
SU0292 # 08 Y:2010 | 08 | 2010 | OPTIMIZE PLANT POWER FACTOR | $12,124 | $37,200 | Not Implemented |
SU0292 # 09 Y:2010 | 09 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,849 | $24,883 | Not Implemented |
SU0292 # 10 Y:2010 | 10 | 2010 | MOVE BOILER TO MORE EFFICIENT LOCATION | $6,648 | $60,575 | Not Implemented |
UW0025 # 01 Y:2009 | 01 | 2009 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $52,500 | $78,750 | Not Implemented |
UW0025 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,361 | $17,335 | Not Implemented |
UW0025 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM TEMPERATURE | $13,200 | $19,800 | Implemented |
UW0025 # 04 Y:2009 | 04 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,986 | $6,091 | Implemented |
SU0273 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,597 | $0 | Not Implemented |
SU0273 # 02 Y:2008 | 02 | 2008 | USE SYNTHETIC LUBRICANT | $3,284 | $0 | Implemented |
SU0273 # 03 Y:2008 | 03 | 2008 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $84,581 | $7,850 | Implemented |
SU0273 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,737 | $128 | Implemented |
SU0273 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $631 | $44 | Implemented |
SU0273 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $221 | $141 | Not Implemented |
SU0273 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,553 | $10,014 | Implemented |
SU0273 # 08 Y:2008 | 08 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $108 | $191 | Not Implemented |
SU0273 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $3,954 | $14,012 | Implemented |
SU0273 # 10 Y:2008 | 10 | 2008 | MINIMIZE WATER USAGE | $133,075 | $550,000 | Implemented |
UW0022 # 01 Y:2008 | 01 | 2008 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $89,303 | $52,321 | Not Implemented |