Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
228
matching recommendationsNAICS | 327110 | Pottery, Ceramics, and Plumbing Fixture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0292 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,577 | $0 | Not Implemented |
SU0292 # 02 Y:2010 | 02 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $4,309 | $46 | Implemented |
SU0292 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,292 | $962 | Implemented |
SU0292 # 04 Y:2010 | 04 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,754 | $5,714 | Not Implemented |
SU0292 # 05 Y:2010 | 05 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $274 | $560 | Not Implemented |
SU0292 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,377 | $81,156 | Not Implemented |
SU0292 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $57,316 | $175,000 | Not Implemented |
SU0292 # 08 Y:2010 | 08 | 2010 | OPTIMIZE PLANT POWER FACTOR | $12,124 | $37,200 | Not Implemented |
SU0292 # 09 Y:2010 | 09 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,849 | $24,883 | Not Implemented |
SU0292 # 10 Y:2010 | 10 | 2010 | MOVE BOILER TO MORE EFFICIENT LOCATION | $6,648 | $60,575 | Not Implemented |
UW0025 # 01 Y:2009 | 01 | 2009 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $52,500 | $78,750 | Not Implemented |
UW0025 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,361 | $17,335 | Not Implemented |
UW0025 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM TEMPERATURE | $13,200 | $19,800 | Implemented |
UW0025 # 04 Y:2009 | 04 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,986 | $6,091 | Implemented |
SU0273 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,597 | $0 | Not Implemented |
SU0273 # 02 Y:2008 | 02 | 2008 | USE SYNTHETIC LUBRICANT | $3,284 | $0 | Implemented |
SU0273 # 03 Y:2008 | 03 | 2008 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $84,581 | $7,850 | Implemented |
SU0273 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,737 | $128 | Implemented |
SU0273 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $631 | $44 | Implemented |
SU0273 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $221 | $141 | Not Implemented |
SU0273 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,553 | $10,014 | Implemented |
SU0273 # 08 Y:2008 | 08 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $108 | $191 | Not Implemented |
SU0273 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $3,954 | $14,012 | Implemented |
SU0273 # 10 Y:2008 | 10 | 2008 | MINIMIZE WATER USAGE | $133,075 | $550,000 | Implemented |
UW0022 # 01 Y:2008 | 01 | 2008 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $89,303 | $52,321 | Not Implemented |