Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
363
matching recommendationsNAICS | 32721 | Glass and Glass Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0765 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $510 | $595 | Implemented |
NC0616 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,695 | $225 | Implemented |
NC0616 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,771 | $43,490 | Implemented |
NC0616 # 05 Y:2018 | 05 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,999 | $100 | Implemented |
NC0616 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $505 | $50 | Implemented |
NC0616 # 07 Y:2018 | 07 | 2018 | INSTALL SENSORS TO DETECT DEFECTS | $112,500 | $150,000 | Implemented |
NC0616 # 08 Y:2018 | 08 | 2018 | REDESIGN PROCESS | $36,741 | $2,500 | Implemented |
NC0616 # 09 Y:2018 | 09 | 2018 | AVOID REWINDING MOTORS MORE THAN TWICE | $2,586 | $5,865 | Implemented |
AM0754 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $123 | $9 | Implemented |
AM0754 # 07 Y:2018 | 07 | 2018 | USE SYNTHETIC LUBRICANT | $312 | $0 | Implemented |
AM0754 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,555 | $3,232 | Implemented |
AM0754 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,670 | $1,000 | Implemented |
AM0754 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,740 | $11,520 | Implemented |
AM0754 # 01 Y:2018 | 01 | 2018 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $63,539 | $195,000 | Implemented |
MZ0250 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,697 | $0 | Implemented |
MZ0250 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $1,786 | $280 | Implemented |
MZ0250 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,351 | $5,600 | Implemented |
OK0981 # 01 Y:2018 | 01 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $124,716 | $75,000 | Implemented |
WV0547 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $15,992 | $5,658 | Implemented |
WV0547 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,491 | $9,434 | Implemented |
WV0547 # 06 Y:2017 | 06 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $970 | $4,600 | Implemented |
WV0547 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $412 | $2,050 | Implemented |
WV0547 # 09 Y:2017 | 09 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $243 | $1,000 | Implemented |
WV0547 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $175 | $850 | Implemented |
AM0725 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,400 | $262,500 | Implemented |