Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
757
matching recommendationsNAICS | 32721 | Glass and Glass Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0931 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,063 | $0 | Implemented |
UD0931 # 08 Y:2015 | 08 | 2015 | REDUCE FLUID FLOW RATES | $14,443 | $14,964 | Not Implemented |
UD0931 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,769 | $24,400 | Implemented |
UD0931 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,937 | $41,800 | Implemented |
UD0931 # 11 Y:2015 | 11 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,127 | $9,200 | Not Implemented |
UD0931 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,628 | $83,660 | Implemented |
LE0396 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $35 | Implemented |
LE0396 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,655 | $4,000 | Not Implemented |
LE0396 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,080 | $2,845 | Implemented |
LE0396 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $214 | $105 | Implemented |
LE0396 # 05 Y:2015 | 05 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,534 | $1,644 | Implemented |
LE0396 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,473 | $1,950 | Not Implemented |
LE0396 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $1,000 | Implemented |
LE0396 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,304 | $9,400 | Not Implemented |
LE0396 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,431 | $13,983 | Not Implemented |
LE0396 # 10 Y:2015 | 10 | 2015 | REPLACE BOILER | $4,068 | $18,400 | Not Implemented |
UD0923 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,241 | $50 | Implemented |
UD0923 # 02 Y:2015 | 02 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $243 | $400 | Not Implemented |
UD0923 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM THICKNESS INSULATION | $28,993 | $2,000 | Not Implemented |
UD0923 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,909 | $10,000 | Not Implemented |
UD0923 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $4,777 | $600 | Not Implemented |
UD0923 # 06 Y:2015 | 06 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,021 | $400 | Not Implemented |
UD0923 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,734 | $0 | Implemented |
UD0923 # 08 Y:2015 | 08 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $5,978 | $19,581 | Implemented |
UD0923 # 09 Y:2015 | 09 | 2015 | COMBINE UTILITY METERS | $105,406 | $156,400 | Not Implemented |