IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 327212 Other Pressed and Blown Glass and Glassware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0618 # 09 Y:2007 09 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,070 $340 Implemented
LL0272 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $102,410 $49,360 Not Implemented
LL0272 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $58,782 $19,636 Implemented
LL0272 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,485 $7,000 Not Implemented
LL0272 # 04 Y:2007 04 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $7,489 $422 Not Implemented
LL0272 # 05 Y:2007 05 2007 INSTALL SKYLIGHTS $2,828 $5,040 Not Implemented
LL0272 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,024 $1,499 Not Implemented
LL0272 # 07 Y:2007 07 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $832 $830 Not Implemented
LL0272 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,020 $2,338 Not Implemented
LL0272 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $1,169 Not Implemented
LL0272 # 10 Y:2007 10 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $517 $5,436 Not Implemented
SU0254 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,902 $0 Implemented
SU0254 # 02 Y:2007 02 2007 USE SYNTHETIC LUBRICANT $3,743 $0 Implemented
SU0254 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,618 $0 Implemented
SU0254 # 04 Y:2007 04 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $18,564 $2,486 Not Implemented
SU0254 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,048 $381 Implemented
SU0254 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $440 $69 Implemented
SU0254 # 07 Y:2007 07 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $25,275 $12,148 Implemented
SU0254 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $24,092 $13,688 Implemented
SU0254 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,567 $63,450 Implemented
SU0254 # 10 Y:2007 10 2007 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $86,095 $97,983 Not Implemented
SU0254 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,604 $6,140 Implemented
SU0254 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $909 Implemented
NC0356 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,291 $30,000 Not Implemented
NC0356 # 02 Y:2007 02 2007 $20,393 $10,000 Implemented