IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

373

matching recommendations
Reset
NAICS 327215 Glass Product Manufacturing Made of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0611 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $20,810 $33,480 Not Implemented
CO0611 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,360 $20,290 Implemented
CO0611 # 06 Y:2008 06 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $1,770 $11,000 Not Implemented
NC0374 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,923 $63,000 Implemented
NC0374 # 02 Y:2008 02 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,372 $18,000 Implemented
NC0374 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,977 $100 Implemented
NC0374 # 04 Y:2008 04 2008 REDESIGN PROCESS $11,653 $22,000 Not Implemented
NC0374 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $7,000 Implemented
NC0374 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,915 $100,000 Implemented
IC0130 # 01 Y:2007 01 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $12,768 $40,352 Not Implemented
IC0130 # 02 Y:2007 02 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,486 $1,890 Not Implemented
IC0130 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,652 $21,323 Not Implemented
IC0130 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,983 $790 Not Implemented
IC0130 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,094 $1,096 Not Implemented
IC0130 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36 $128 Not Implemented
IC0130 # 07 Y:2007 07 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,363 $231 Not Implemented
IC0130 # 08 Y:2007 08 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,216 $5,830 Not Implemented
IC0130 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $499 $684 Not Implemented
IC0130 # 10 Y:2007 10 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,396 $8,878 Not Implemented
IC0130 # 11 Y:2007 11 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,209 $0 Not Implemented
UW0002 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,263 $85,000 Not Implemented
UW0002 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $10,893 $16,323 Not Implemented
UW0002 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,000 $9,385 Implemented
UW0002 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $5,998 $2,692 Implemented
UW0002 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $252 Implemented