IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

377

matching recommendations
Reset
NAICS 327215 Glass Product Manufacturing Made of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0335 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $67 $147 Implemented
NC0335 # 07 Y:2006 07 2006 INSTALL SENSORS TO DETECT DEFECTS $1,400 $1,000 Implemented
MI0112 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $319,237 $91,320 Not Implemented
MI0112 # 02 Y:2005 02 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $89,581 $90 Implemented
MI0112 # 03 Y:2005 03 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $19,066 $8,226 Implemented
MI0112 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,289 $600 Implemented
MI0112 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,504 $1,393 Implemented
IA0365 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,317 $50 Implemented
IA0365 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $19 Implemented
IA0365 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,995 $3,000 Implemented
IA0365 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,148 $1,001 Not Implemented
IA0365 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $628 $1,600 Implemented
IA0365 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,000,000 $152,672 Implemented
IA0365 # 07 Y:2005 07 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,495 $14,000 Not Implemented
IA0365 # 08 Y:2005 08 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $21,000 $7,216 Implemented
MI0102 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,313 $40,224 Not Implemented
MI0102 # 02 Y:2005 02 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $66,212 $29,320 Not Implemented
MI0102 # 03 Y:2005 03 2005 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $23,325 $1,104 Not Implemented
MI0102 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,890 $162 Not Implemented
MI0102 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,049 $870 Not Implemented
CO0558 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $350 Implemented
CO0558 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,700 $2,720 Implemented
CO0558 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $6,030 Implemented
CO0558 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $234 $588 Implemented
CO0558 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,810 $1,910 Not Implemented