IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 327310 Cement Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0452 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $12,308 $0 Not Implemented
UF0452 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,797 $8,904 Not Implemented
UF0452 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,408 $0 Not Implemented
UF0452 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,387 $7,579 Not Implemented
UM0387 # 01 Y:2011 01 2011 OPERATE BOILERS ON HIGH FIRE SETTING $48,827 $157,500 Not Implemented
UM0387 # 02 Y:2011 02 2011 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $139,284 $750,000 Not Implemented
UM0387 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $131,444 $85,000 Not Implemented
UM0387 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $57,295 $12,490 Not Implemented
UM0387 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $21,900 $55,250 Not Implemented
AM0593 # 01 Y:2011 01 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $106,400 $0 Not Implemented
AM0593 # 02 Y:2011 02 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,900 $2,600 Not Implemented
AM0593 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,900 $1,000 Implemented
AM0593 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,600 $6,900 Implemented
AM0593 # 05 Y:2011 05 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,260 $500 Implemented
AM0593 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,860 $364 Implemented
UW0042 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $702,459 $5,700,000 Not Implemented
UW0042 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $26,153 $26,153 Not Implemented
UW0042 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,225 $81,585 Implemented
UA0051 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,487 $1,000 Not Implemented
UA0051 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,840 $10,000 Implemented
UA0051 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,427 $4,500 Implemented
UA0051 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,331 $640 Not Implemented
UA0051 # 05 Y:2010 05 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,177 $5,219 Implemented
UA0051 # 06 Y:2010 06 2010 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $48,136 $21,075 Not Implemented
IA0406 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,718 $500 Implemented