IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 327310 Cement Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0406 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $896 $100 Implemented
IA0406 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $364 $25 Implemented
IA0406 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $7,396 $1,000 Not Implemented
IA0406 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $386 $55 Not Implemented
IA0406 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $507 $100 Implemented
IA0406 # 07 Y:2007 07 2007 USE RADIANT HEATER FOR SPOT HEATING $21,600 $10,000 Implemented
UM0303 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $338,489 $344,200 Not Implemented
UM0303 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,914 $1,100 Implemented
UM0303 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,020 $7,545 Not Implemented
UM0303 # 04 Y:2006 04 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,089 $1,000 Not Implemented
UM0303 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $2,659 $552 Not Implemented
MS0275 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,870 $34,746 Implemented
MS0275 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,066 $392 Implemented
MS0275 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $7,356 $3,025 Implemented
MS0275 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,972 $15,438 Not Implemented
MS0275 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,020 $9,612 Implemented
MS0275 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,823 $2,271 Not Implemented
UF0355 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,486 $80,890 Implemented
UF0355 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,072 $93,200 Implemented
UF0355 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,438 $478 Implemented
UF0355 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,786 $0 Not Implemented
UF0355 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,000 $23,755 Implemented
UF0355 # 06 Y:2005 06 2005 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $12,491 $50,000 Implemented
UF0355 # 07 Y:2005 07 2005 RECYCLE FLUORESCENT LAMPS $625 $3,496 Implemented
WV0284 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,486 $300 Implemented