IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
NAICS 327420 Gypsum Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0406 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $20,625 $11,478 Not Implemented
AS0406 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,848 $1,000 Not Implemented
UF0337 # 01 Y:2004 01 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $309,508 $180,000 Not Implemented
UF0337 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $1,095 $68,454 Not Implemented
UF0337 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $9,552 $13,873 Not Implemented
UF0337 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,459 $0 Not Implemented
UF0337 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,725 $385 Not Implemented
UF0337 # 06 Y:2004 06 2004 OPTIMIZE PLANT POWER FACTOR $3,477 $12,000 Not Implemented
AS0363 # 01 Y:2003 01 2003 INSTALL SKYLIGHTS $552 $22,526 Not Implemented
AS0363 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $2,353 Implemented
AS0363 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $10,939 Not Implemented
AS0363 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $6,720 $750 Implemented
AS0363 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,401 $10,050 Not Implemented
AS0363 # 06 Y:2003 06 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,049,273 $2,100,000 Not Implemented
UF0322 # 01 Y:2003 01 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,080,457 $50,000 Not Implemented
UF0322 # 02 Y:2003 02 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,420,987 $5,000,000 Not Implemented
UF0322 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $8,639 $303 Implemented
UF0322 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47,174 $0 Implemented
UF0322 # 05 Y:2003 05 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $85,121 $87,198 Not Implemented
UF0322 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,372 $0 Not Implemented
UF0322 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,483 $47,300 Not Implemented
UF0322 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,073 $860 Not Implemented
UF0322 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $159,201 $2,888 Not Implemented
UF0322 # 10 Y:2003 10 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,466 $3,496 Not Implemented