IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
NAICS 3279 Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0777 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,821 $1,900 Not Implemented
UD0777 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,188 $28,755 Not Implemented
UD0777 # 11 Y:2008 11 2008 USE MINIMUM STEAM OPERATING PRESSURE $7,900 $0 Not Implemented
UD0777 # 12 Y:2008 12 2008 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $8,318 $19,000 Implemented
UD0777 # 13 Y:2008 13 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,240 $0 Implemented
UD0777 # 14 Y:2008 14 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $3,815 Implemented
UD0777 # 15 Y:2008 15 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,436 $0 Not Implemented
SD0399 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $6,025 Implemented
SD0399 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,267 $6,700 Not Implemented
SD0399 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,543 $4,247 Not Implemented
SD0399 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $5,934 Implemented
SD0399 # 05 Y:2007 05 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,129 $0 Not Implemented
WV0362 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $80,064 $26,135 Not Implemented
WV0362 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,461 $13,900 Not Implemented
WV0362 # 03 Y:2007 03 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,679 $2,000 Not Implemented
WV0362 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,748 $660 Not Implemented
WV0362 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,397 $0 Implemented
WV0362 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $0 Implemented
WV0362 # 07 Y:2007 07 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,693 $1,500 Implemented
WV0362 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,851 $185 Implemented
WV0362 # 09 Y:2007 09 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,851 $1,000 Implemented
WV0362 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $978 Implemented
WV0362 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $224 Not Implemented
WV0362 # 12 Y:2007 12 2007 INSULATE BARE EQUIPMENT $1,295 $740 Implemented
WV0362 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $913 $20 Implemented