IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
NAICS 3279 Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0343 # 07 Y:2006 07 2006 INSTALL SENSORS TO DETECT DEFECTS $1,350,000 $800,000 Not Implemented
NC0343 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $424 Not Implemented
AS0428 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $15,000 $0 n/a
AS0428 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,791 $1,000 n/a
AS0428 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,918 $2,500 n/a
AS0428 # 04 Y:2006 04 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,269 $5,600 n/a
AS0428 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,252 $1,500 n/a
AS0428 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $5,000 n/a
AS0428 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $614 $300 n/a
AS0428 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $475 $4,000 n/a
AS0429 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,688 $1,000 n/a
AS0429 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,039 $500 n/a
AS0429 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,127 $1,000 n/a
AS0429 # 04 Y:2006 04 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $34 $3,200 n/a
OK0716 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $10,863 $38,544 Not Implemented
OK0716 # 02 Y:2005 02 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,900 $200 Not Implemented
OK0716 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $-28,676 $0 Not Implemented
OK0716 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,725 $125 Not Implemented
OK0716 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $212 $475 Not Implemented
OK0716 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $579 $25 Not Implemented
OK0716 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $153 $1,346 Not Implemented
MA0584 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,369 $2,100 Implemented
MA0584 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,880 $2,800 Implemented
MA0584 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $3,727 $11,326 Not Implemented
MA0584 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,152 $1,400 Implemented