IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 32791 Abrasive Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0505 # 01 Y:2021 01 2021 DISCONNECT BALLASTS $59 $0 Implemented
SU0505 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $0 Implemented
SU0505 # 03 Y:2021 03 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,333 $79 Implemented
SU0505 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $108 Implemented
SU0497 # 03 Y:2020 03 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,235 $257 Implemented
SU0497 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $327 $32 Implemented
SU0497 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,107 $51,554 Implemented
SU0497 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $177 $5,032 Implemented
SU0497 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $510 Implemented
SU0497 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $1,191 $882 Implemented
NC0609 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $200 Implemented
NC0609 # 06 Y:2018 06 2018 DEVELOP A REPAIR/REPLACE POLICY $1,705 $5,685 Implemented
NC0609 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $2,500 Implemented
NC0609 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,593 $8,972 Implemented
TR0007 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $5,927 $22,500 Implemented
TR0007 # 03 Y:2018 03 2018 RECYCLE FLUORESCENT LAMPS $10,606 $23,530 Implemented
TR0007 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $421 $38 Implemented
TR0007 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,572 $500 Implemented
TR0007 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109 $195 Implemented
TR0007 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $4,304 $6,855 Implemented
TR0007 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,558 $3,000 Implemented
UK1604 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $14,750 $8,715 Implemented
UK1604 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $153 $280 Implemented
UK1604 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,018 $3,500 Implemented
UK1604 # 06 Y:2016 06 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,304 $3,620 Implemented