Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 32791 | Abrasive Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1604 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $153 | $280 | Implemented |
UK1604 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $14,750 | $8,715 | Implemented |
OR0649 # 11 Y:2015 | 11 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,941 | $19,500 | Implemented |
OR0649 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,638 | $1,819 | Implemented |
OR0649 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $2,139 | Implemented |
OR0649 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,484 | $2,065 | Implemented |
MI0190 # 01 Y:2010 | 01 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,345 | $1,020 | Implemented |
MI0190 # 03 Y:2010 | 03 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,721 | $2,507 | Implemented |
LE0293 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,797 | $1,800 | Implemented |
LE0293 # 01 Y:2009 | 01 | 2009 | USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED | $25,144 | $15,000 | Implemented |
LE0293 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,105 | $2,932 | Implemented |
LE0293 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $2,864 | $700 | Implemented |
LE0293 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,196 | $58,455 | Implemented |
LE0293 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $717 | $1,675 | Implemented |
LE0293 # 05 Y:2009 | 05 | 2009 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,697 | $27,600 | Implemented |
NC0393 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $256 | $100 | Implemented |
NC0393 # 02 Y:2009 | 02 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,650 | $1,000 | Implemented |
NC0393 # 03 Y:2009 | 03 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,020 | $2,216 | Implemented |
NC0393 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $967 | $2,795 | Implemented |
UD0777 # 04 Y:2008 | 04 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $70,469 | $40,000 | Implemented |
UD0777 # 06 Y:2008 | 06 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $35,664 | $50,000 | Implemented |
UD0777 # 07 Y:2008 | 07 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $35,347 | $15,000 | Implemented |
UD0777 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,252 | $1,000 | Implemented |
UD0777 # 12 Y:2008 | 12 | 2008 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $8,318 | $19,000 | Implemented |
UD0777 # 13 Y:2008 | 13 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,240 | $0 | Implemented |