IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 32791 Abrasive Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1604 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $153 $280 Implemented
UK1604 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $14,750 $8,715 Implemented
OR0649 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,941 $19,500 Implemented
OR0649 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,638 $1,819 Implemented
OR0649 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,277 $2,139 Implemented
OR0649 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,484 $2,065 Implemented
MI0190 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,345 $1,020 Implemented
MI0190 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,721 $2,507 Implemented
LE0293 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,797 $1,800 Implemented
LE0293 # 01 Y:2009 01 2009 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $25,144 $15,000 Implemented
LE0293 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,105 $2,932 Implemented
LE0293 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,864 $700 Implemented
LE0293 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,196 $58,455 Implemented
LE0293 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $717 $1,675 Implemented
LE0293 # 05 Y:2009 05 2009 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,697 $27,600 Implemented
NC0393 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $100 Implemented
NC0393 # 02 Y:2009 02 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,650 $1,000 Implemented
NC0393 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,020 $2,216 Implemented
NC0393 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $2,795 Implemented
UD0777 # 04 Y:2008 04 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $70,469 $40,000 Implemented
UD0777 # 06 Y:2008 06 2008 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $35,664 $50,000 Implemented
UD0777 # 07 Y:2008 07 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $35,347 $15,000 Implemented
UD0777 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,252 $1,000 Implemented
UD0777 # 12 Y:2008 12 2008 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $8,318 $19,000 Implemented
UD0777 # 13 Y:2008 13 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,240 $0 Implemented