IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
NAICS 32791 Abrasive Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0609 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $173 $350 Not Implemented
NC0609 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,593 $8,972 Implemented
NC0609 # 01 Y:2018 01 2018 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $9,405 $0 Not Implemented
NC0609 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $200 Implemented
TR0007 # 04 Y:2018 04 2018 METER WASTE WATER $6,760 $2,650 Not Implemented
TR0007 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $5,927 $22,500 Implemented
TR0007 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,558 $3,000 Implemented
TR0007 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $4,304 $6,855 Implemented
TR0007 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,572 $500 Implemented
TR0007 # 03 Y:2018 03 2018 RECYCLE FLUORESCENT LAMPS $10,606 $23,530 Implemented
TR0007 # 07 Y:2018 07 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $750 $2,212 Not Implemented
TR0007 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $421 $38 Implemented
TR0007 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109 $195 Implemented
UK1604 # 10 Y:2016 10 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,729 $6,000 Not Implemented
UK1604 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,645 $1,200 Not Implemented
UK1604 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $56 $61 Implemented
UK1604 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,094 $5,000 Implemented
UK1604 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $14,750 $8,715 Implemented
UK1604 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,425 $67,500 Not Implemented
UK1604 # 06 Y:2016 06 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,304 $3,620 Implemented
UK1604 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,018 $3,500 Implemented
UK1604 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $153 $280 Implemented
UK1604 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $166 $196 Not Implemented
OR0649 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,941 $19,500 Implemented
OR0649 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,484 $2,065 Implemented