IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0362 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,461 $13,900 Not Implemented
WV0362 # 03 Y:2007 03 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,679 $2,000 Not Implemented
WV0362 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,748 $660 Not Implemented
WV0362 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,397 $0 Implemented
WV0362 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,787 $0 Implemented
WV0362 # 07 Y:2007 07 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,693 $1,500 Implemented
WV0362 # 08 Y:2007 08 2007 DEVELOP A REPAIR/REPLACE POLICY $1,851 $185 Implemented
WV0362 # 09 Y:2007 09 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,851 $1,000 Implemented
WV0362 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $978 Implemented
WV0362 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $224 Not Implemented
WV0362 # 12 Y:2007 12 2007 INSULATE BARE EQUIPMENT $1,295 $740 Implemented
WV0362 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $913 $20 Implemented
WV0362 # 14 Y:2007 14 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $297 $400 Implemented
AM0526 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $29,900 $18,130 Not Implemented
AM0526 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $15,310 $65,120 Not Implemented
AM0526 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,200 $16,400 Not Implemented
AM0526 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,660 $500 Not Implemented
AM0526 # 05 Y:2007 05 2007 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,500 $0 Not Implemented
AM0526 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $8,650 $8,650 Not Implemented
AM0526 # 07 Y:2007 07 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,550 $0 Not Implemented
AM0526 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,545 $2,300 Not Implemented
AM0526 # 09 Y:2007 09 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,080 $2,850 Not Implemented
AM0526 # 10 Y:2007 10 2007 USE SYNTHETIC LUBRICANT $1,915 $0 Not Implemented
NC0343 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $137,000 $28,000 Not Implemented
NC0343 # 02 Y:2006 02 2006 REDESIGN PROCESS $54,257 $30,000 Not Implemented