Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0789 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $985 | $0 | Implemented |
OR0789 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,115 | $1,800 | Not Implemented |
OR0789 # 05 Y:2024 | 05 | 2024 | INSTALL COMMON HEADER ON COMPRESSORS | $16,245 | $4,904 | Not Implemented |
OR0789 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,616 | $14,338 | Not Implemented |
OR0789 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,513 | $0 | Implemented |
OR0716 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $9,287 | $19,796 | Not Implemented |
OR0716 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,971 | $1,200 | Implemented |
OR0716 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,289 | $1,500 | Implemented |
OR0716 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,967 | $10,000 | Implemented |
OR0716 # 02 Y:2019 | 02 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $96,953 | $165,004 | Implemented |
OR0716 # 01 Y:2019 | 01 | 2019 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $170,737 | $8,015 | Not Implemented |
OR0716 # 07 Y:2019 | 07 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,641 | $23,504 | Not Implemented |
OR0684 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,985 | $500 | Not Implemented |
OR0684 # 04 Y:2017 | 04 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,832 | $670 | Implemented |
OR0684 # 02 Y:2017 | 02 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,412 | $20,340 | Implemented |
OR0684 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,474 | $8,100 | Implemented |
OR0684 # 06 Y:2017 | 06 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $229,046 | $405,000 | Implemented |
OR0684 # 07 Y:2017 | 07 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $41,279 | $86,043 | Implemented |
OR0684 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $2,196 | $1,831 | Not Implemented |
OR0684 # 08 Y:2017 | 08 | 2017 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $156,346 | $600,000 | Not Implemented |
OR0671 # 04 Y:2016 | 04 | 2016 | REDESIGN PROCESS | $4,005 | $3,500 | Not Implemented |
OR0671 # 03 Y:2016 | 03 | 2016 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $24,528 | $1,495 | Not Implemented |
OR0671 # 02 Y:2016 | 02 | 2016 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $190,362 | $300,000 | Not Implemented |
OR0671 # 01 Y:2016 | 01 | 2016 | ELIMINATE/REDUCE AN OPERATION | $357,967 | $669,217 | Not Implemented |
OR0671 # 05 Y:2016 | 05 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,295 | $1,000 | Implemented |