Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0026 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $478 | $15 | Implemented |
BS0026 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $339 | $120 | Implemented |
BS0026 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,850 | $752 | Implemented |
UM0435 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,000 | $3,000 | Implemented |
UM0435 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $966 | $2,500 | Implemented |
UM0435 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,450 | $4,500 | Implemented |
AM0644 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $43,700 | $147,000 | Implemented |
AM0644 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $390 | $525 | Implemented |
AM0644 # 08 Y:2013 | 08 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,190 | $0 | Implemented |
AM0644 # 06 Y:2013 | 06 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $24,370 | $0 | Implemented |
AM0644 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,120 | $50 | Implemented |
AM0644 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,950 | $50,800 | Implemented |
AM0644 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $51,450 | $2,000 | Implemented |
AM0644 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $211,550 | $5,000 | Implemented |
UA3030 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $71,086 | $800 | Implemented |
UD0888 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $0 | Implemented |
UD0888 # 01 Y:2013 | 01 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $396 | $5,000 | Implemented |
UK1313 # 03 Y:2013 | 03 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $23,080 | $10,000 | Implemented |
UK1313 # 01 Y:2013 | 01 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $396 | $5,000 | Implemented |
UK1313 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $0 | Implemented |
UD0888 # 12 Y:2013 | 12 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,092 | $0 | Implemented |
UD0888 # 20 Y:2013 | 20 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $412 | $0 | Implemented |
UD0888 # 08 Y:2013 | 08 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,313 | $0 | Implemented |
UD0888 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,284 | $15,000 | Implemented |
UD0888 # 14 Y:2013 | 14 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $3,770 | $0 | Implemented |