IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0074 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,398 $951 Implemented
IP0074 # 06 Y:2016 06 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $473 $101 Implemented
IP0074 # 08 Y:2016 08 2016 APPLY FOR INVESTMENT INCENTIVES $6,707 $5,000 Implemented
IP0074 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,366 $308 Implemented
IP0074 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,888 $292 Implemented
IP0074 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,616 $56,725 Implemented
TT0180 # 08 Y:2016 08 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,047 $1,575 Implemented
TT0180 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,241 $2,500 Implemented
TT0180 # 05 Y:2016 05 2016 INSTALL COMMON HEADER ON COMPRESSORS $8,381 $11,700 Implemented
TT0180 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,587 $100,037 Implemented
TT0180 # 03 Y:2016 03 2016 UPGRADE CONTROLS ON COMPRESSORS $25,771 $40,000 Implemented
TT0180 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,289 $0 Implemented
TT0180 # 01 Y:2016 01 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $27,451 $700 Implemented
IA0563 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,182 $1,900 Implemented
IA0563 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $570 $2,800 Implemented
IA0563 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,138 $37,931 Implemented
IA0563 # 03 Y:2016 03 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,852 $13,275 Implemented
IA0563 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,484 $700 Implemented
IA0563 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,656 $560 Implemented
UA0165 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,610 $4,226 Implemented
UA0165 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,642 $950 Implemented
UA0165 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,795 Implemented
UA0165 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,367 $52,490 Implemented
NC0572 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $944 $200 Implemented
NC0572 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,293 $35,726 Implemented