IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
NAICS 331110 Iron and Steel Mills and Ferroalloy Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0567 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,925 $1,020 Not Implemented
AM0567 # 02 Y:2009 02 2009 MODIFY WORKLOAD $3,265 $500 Implemented
AM0567 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,035 $20 Not Implemented
AM0567 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $305 Implemented
UW0019 # 01 Y:2008 01 2008 REPLACE BOILER $16,074 $25,870 Implemented
UW0019 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $15,042 $2,500 Not Implemented
UW0019 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $14,046 $2,908 Not Implemented
UW0019 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $4,446 $2,439 Not Implemented
LE0263 # 01 Y:2007 01 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $88,058 $368,500 Not Implemented
LE0263 # 02 Y:2007 02 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,097 $300 Not Implemented
LE0263 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $103,515 $150,000 Not Implemented
LE0263 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,993 $70,000 Not Implemented
LE0263 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $20,000 Not Implemented
LE0263 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,639 $1,000 Not Implemented
LE0263 # 07 Y:2007 07 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,256 $50,000 Not Implemented
LE0263 # 08 Y:2007 08 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $9,899 $22,894 Not Implemented
LE0263 # 09 Y:2007 09 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,837 $6,837 Not Implemented
LE0263 # 10 Y:2007 10 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,781 $6,000 Not Implemented
LE0263 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,214 $1,000 Not Implemented
LE0263 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $2,460 $1,200 Not Implemented
UU0113 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $180 Not Implemented
UU0113 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $173,190 $46,250 Not Implemented
UU0113 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,530 $20,000 Not Implemented
UU0113 # 04 Y:2006 04 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $87,860 $500,000 Not Implemented
IC0123 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,641,138 $12,550,416 Implemented