IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

999

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0813 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $19,954 $13,110 Implemented
OK0813 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $990 Implemented
OK0813 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $1,037 $190 Implemented
OK0813 # 10 Y:2011 10 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $19,937 $8,250 Not Implemented
OK0813 # 11 Y:2011 11 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,447 $25,472 Implemented
TT0051 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $30,200 $50,000 Not Implemented
TT0051 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,895 $4,900 Not Implemented
TT0051 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $8,500 $15,750 Not Implemented
TT0051 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,300 $2,800 Not Implemented
OK0798 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $176,587 $1,026,000 Not Implemented
OK0798 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,758 $239,328 Not Implemented
OK0798 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $5,205 Implemented
OK0798 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $2,009 Implemented
OK0798 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,826 $900 Implemented
OK0798 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,240 $0 Implemented
OK0798 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,000 $0 Implemented
OK0798 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $8,199 $2,430 Implemented
OK0798 # 09 Y:2010 09 2010 INSTALL SET-BACK TIMERS $3,115 $1,503 Not Implemented
OK0798 # 10 Y:2010 10 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,239 $11,718 Not Implemented
OK0798 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $1,991 Implemented
UD0817 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $66,672 $600 Implemented
UD0817 # 02 Y:2010 02 2010 OPTIMIZE PLANT POWER FACTOR $63,586 $41,250 Not Implemented
UD0817 # 03 Y:2010 03 2010 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,387 $0 Not Implemented
UD0817 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,364 $1,876 Not Implemented
UD0817 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,546 $3,000 Not Implemented