IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

999

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0702 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,215 $600 Not Implemented
UD0702 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $114 Implemented
LE0194 # 01 Y:2004 01 2004 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $866,040 $200,000 Implemented
LE0194 # 02 Y:2004 02 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,658 $12,500 Implemented
LE0194 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $35,941 $5,625 Not Implemented
LE0194 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,915 $2,000 Not Implemented
LE0194 # 05 Y:2004 05 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,360 $2,500 Not Implemented
LE0194 # 06 Y:2004 06 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,196 $4,000 Implemented
LE0194 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,787 $750 Implemented
UD0700 # 01 Y:2004 01 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $454,279 $226,320 Not Implemented
UD0700 # 02 Y:2004 02 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $256,000 $538,944 Not Implemented
UD0700 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $35,000 $0 Not Implemented
UD0700 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,353 $82,536 Implemented
UD0700 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,176 $1,380 Not Implemented
UD0700 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,941 $0 Not Implemented
UD0700 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,656 $3,000 Not Implemented
UD0700 # 08 Y:2004 08 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,312 $8,302 Not Implemented
UD0700 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,471 $4,116 Not Implemented
UD0700 # 10 Y:2004 10 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,258 $1,405 Not Implemented
UD0700 # 11 Y:2004 11 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,104 $700 Not Implemented
UD0700 # 12 Y:2004 12 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $850 $328 Not Implemented
UD0700 # 13 Y:2004 13 2004 REDUCE FLUID FLOW RATES $774 $850 Not Implemented
UD0700 # 14 Y:2004 14 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $243 Not Implemented
UD0700 # 15 Y:2004 15 2004 INSULATE BARE EQUIPMENT $604 $1,575 Not Implemented
UD0700 # 16 Y:2004 16 2004 UPGRADE CONTROLS ON COMPRESSORS $588 $500 Implemented