Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,035
matching recommendationsNAICS | 3312 | Steel Product Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0990 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,458 | $400 | Not Implemented |
UD0990 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,774 | $10,470 | Not Implemented |
UD0990 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,379 | $200,263 | Not Implemented |
UK1801 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,208 | $48,400 | Implemented |
UK1801 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $2,773 | $1,959 | Implemented |
UK1801 # 03 Y:2018 | 03 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $26,076 | $3,990 | Not Implemented |
UK1801 # 04 Y:2018 | 04 | 2018 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $23,118 | $11,500 | Not Implemented |
UK1801 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,263 | $2,190 | Implemented |
UK1801 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $860 | $1,250 | Implemented |
UK1801 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $8,475 | $2,977 | Not Implemented |
UK1801 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $3,719 | $1,526 | Not Implemented |
UK1801 # 09 Y:2018 | 09 | 2018 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,865 | $5,895 | Not Implemented |
UK1801 # 10 Y:2018 | 10 | 2018 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,756 | $5,475 | Not Implemented |
UK1801 # 11 Y:2018 | 11 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,054 | $0 | Not Implemented |
IP0086 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,463 | $0 | Implemented |
IP0086 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,932 | $4 | Not Implemented |
IP0086 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,016 | $90 | Not Implemented |
IP0086 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $137 | $8 | Implemented |
IP0086 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,071 | $775 | Not Implemented |
IP0086 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,677 | $1,400 | Not Implemented |
IP0086 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,028 | $7,975 | Not Implemented |
IP0086 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $522 | $204 | Implemented |
IP0086 # 09 Y:2017 | 09 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,994 | $1,740 | Not Implemented |
IP0086 # 10 Y:2017 | 10 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $155 | $109 | Not Implemented |
IP0086 # 11 Y:2017 | 11 | 2017 | OPTIMIZE PLANT POWER FACTOR | $23,517 | $28,545 | Not Implemented |