IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1065 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,334 $3,051 n/a
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 n/a
UD1065 # 06 Y:2023 06 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $210 $741 n/a
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 n/a
UD1065 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $19,345 $19,667 n/a
UD1065 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $589 $0 n/a
UD1065 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,692 $430 n/a
UD1065 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38,039 $0 n/a
UD0990 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $574 $1,000 Not Implemented
UD0990 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,774 $10,470 Not Implemented
UD0990 # 04 Y:2018 04 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,458 $400 Not Implemented
UD0990 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $72,351 $48,000 Not Implemented
UD0990 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,680 $4,200 Not Implemented
UD0990 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,379 $200,263 Not Implemented
UD0962 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,104 $1,000 Implemented
UD0962 # 04 Y:2017 04 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,906 $23,600 Not Implemented
UD0962 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,115 $20,000 Not Implemented
UD0962 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,808 $5,292 Not Implemented
UD0962 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,226 $3,000 Not Implemented
UD0962 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,049 $17,049 Not Implemented
UD0962 # 01 Y:2017 01 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $452 $300 Not Implemented
UD0962 # 05 Y:2017 05 2017 INSTALL AUTOMATIC STACK DAMPER $847 $1,050 Not Implemented
UD0962 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $7,630 $8,990 Implemented
UD0962 # 02 Y:2017 02 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,791 $211,700 Implemented
UD0946 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $3,057 $2,000 Not Implemented