Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
316
matching recommendationsNAICS | 3312 | Steel Product Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0499 # 01 Y:2005 | 01 | 2005 | MODIFY WORKLOAD | $42,000 | $3,600 | Implemented |
WI0499 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $967 | $1,280 | Implemented |
WI0499 # 05 Y:2005 | 05 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,285 | $300 | Implemented |
WI0499 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,192 | $22,500 | Implemented |
WI0499 # 03 Y:2005 | 03 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,400 | $0 | Not Implemented |
WI0499 # 02 Y:2005 | 02 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $9,925 | $600 | Implemented |
WI0499 # 07 Y:2005 | 07 | 2005 | INSTALL SPECTRAL REFLECTORS / DELAMP | $344 | $0 | Implemented |
WV0321 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,125 | $454 | Implemented |
WV0321 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,363 | $25 | Implemented |
WV0321 # 02 Y:2005 | 02 | 2005 | UPGRADE CONVEYORS | $2,844 | $4,000 | Not Implemented |
WV0321 # 01 Y:2005 | 01 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,415 | $1,613 | Implemented |
WV0321 # 10 Y:2005 | 10 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $532 | $140 | Not Implemented |
WV0321 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $875 | $312 | Implemented |
WV0321 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,363 | $2,650 | Implemented |
WV0321 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,340 | $210 | Not Implemented |
WV0321 # 08 Y:2005 | 08 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,323 | $1,782 | Not Implemented |
WV0321 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,508 | $9,090 | Implemented |
UU0087 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,680 | $240 | Not Implemented |
UU0087 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $470 | $2,900 | Not Implemented |
UU0087 # 01 Y:2005 | 01 | 2005 | EXPAND OPERATIONS INTO UNUSED SPACE | $84,030 | $200,000 | Not Implemented |
UU0087 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,180 | $3,040 | Not Implemented |
UU0087 # 02 Y:2005 | 02 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,270 | $0 | Not Implemented |
UD0722 # 06 Y:2005 | 06 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,730 | $0 | Not Implemented |
UD0722 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $104 | $102 | Implemented |
UD0722 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,734 | $9,650 | Implemented |