IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 331210 Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented
WV0331 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $686 $440 Implemented
WV0331 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $778 $1,460 Implemented
WV0331 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $1,000 Implemented
WV0331 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,523 $320 Implemented
WV0331 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,906 $1,560 Implemented
WV0331 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,957 $2,264 Implemented
WV0331 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,865 $22,825 Implemented
WV0317 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,531 $680 Implemented
WV0317 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $4,392 $855 Implemented
WV0317 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,285 $128 Implemented
WV0317 # 09 Y:2005 09 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,086 $2,295 Implemented
WV0317 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $1,219 $2,680 Implemented
WV0317 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $761 $205 Implemented
WV0317 # 13 Y:2005 13 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $400 $240 Implemented
WV0317 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,041 $60 Implemented
WV0317 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,217 $490 Implemented
WV0291 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $100 Implemented
WV0291 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,186 $0 Implemented
WV0291 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,578 $4,824 Implemented
WV0291 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $6,488 $0 Implemented
WV0291 # 01 Y:2004 01 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,733 $360 Implemented