Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
342
matching recommendationsNAICS | 331210 | Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0087 # 01 Y:2005 | 01 | 2005 | EXPAND OPERATIONS INTO UNUSED SPACE | $84,030 | $200,000 | Not Implemented |
UU0087 # 02 Y:2005 | 02 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,270 | $0 | Not Implemented |
UU0087 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,180 | $3,040 | Not Implemented |
UU0087 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,680 | $240 | Not Implemented |
UU0087 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $470 | $2,900 | Not Implemented |
WV0317 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $4,392 | $855 | Implemented |
WV0317 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,041 | $60 | Implemented |
WV0317 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,217 | $490 | Implemented |
WV0317 # 03 Y:2005 | 03 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,415 | $5,677 | Not Implemented |
WV0317 # 02 Y:2005 | 02 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $23,795 | $50,000 | Not Implemented |
WV0317 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,323 | $0 | Not Implemented |
WV0317 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $761 | $205 | Implemented |
WV0317 # 11 Y:2005 | 11 | 2005 | INSTALL OCCUPANCY SENSORS | $1,219 | $2,680 | Implemented |
WV0317 # 10 Y:2005 | 10 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,435 | $2,075 | Not Implemented |
WV0317 # 09 Y:2005 | 09 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,086 | $2,295 | Implemented |
WV0317 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $4,285 | $128 | Implemented |
WV0317 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,531 | $680 | Implemented |
WV0317 # 13 Y:2005 | 13 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $400 | $240 | Implemented |
IC0094 # 01 Y:2005 | 01 | 2005 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $28,301 | $54,519 | Not Implemented |
IC0094 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,962 | $6,778 | Not Implemented |
IC0094 # 03 Y:2005 | 03 | 2005 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $24,437 | $32,056 | Implemented |
IC0094 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,623 | $3,900 | Implemented |
IC0094 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $992 | $890 | Not Implemented |
IC0094 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Not Implemented |
IC0094 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,655 | $2,640 | Not Implemented |