Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
668
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0315 # 02 Y:2006 | 02 | 2006 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $10,595 | $900 | Not Implemented |
BD0315 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,074 | $16,950 | Not Implemented |
BD0315 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,730 | $3,356 | Not Implemented |
BD0315 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,369 | $750 | Implemented |
BD0315 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,167 | $7,043 | Not Implemented |
BD0315 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $379 | Implemented |
BD0315 # 08 Y:2006 | 08 | 2006 | USE SYNTHETIC LUBRICANT | $1,246 | $2,000 | Not Implemented |
BD0315 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,038 | $0 | Not Implemented |
BD0315 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $588 | $1,050 | Not Implemented |
BD0315 # 11 Y:2006 | 11 | 2006 | AUTOMATE PAYROLL SYSTEM | $10,530 | $7,000 | Not Implemented |
LL0251 # 01 Y:2006 | 01 | 2006 | CONVERT TO OXYFUEL BURNERS | $457,261 | $150,000 | Not Implemented |
LL0251 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,258 | $11,040 | Not Implemented |
LL0251 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $19,891 | $2,392 | Implemented |
LL0251 # 04 Y:2006 | 04 | 2006 | USE PHOTOCELL CONTROLS | $4,548 | $450 | Not Implemented |
LL0251 # 05 Y:2006 | 05 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,060 | $3,280 | Not Implemented |
LL0251 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,767 | $3,600 | Not Implemented |
LL0251 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $6,369 | $9,300 | Implemented |
LL0251 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $634 | $787 | Implemented |
LL0251 # 09 Y:2006 | 09 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $508 | $960 | Not Implemented |
LL0251 # 10 Y:2006 | 10 | 2006 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $302 | $930 | Not Implemented |
LL0251 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $245 | Not Implemented |
UD0739 # 01 Y:2006 | 01 | 2006 | CHANGE OPERATING CONDITIONS | $41,626 | $4,000 | Implemented |
UD0739 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $11,417 | $3,300 | Not Implemented |
UD0739 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,822 | $23,400 | Not Implemented |
UD0739 # 04 Y:2006 | 04 | 2006 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,397 | $0 | Implemented |