IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 331221 Rolled Steel Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented
LE0283 # 23 Y:2009 23 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,799 $32,466 Implemented
LE0283 # 24 Y:2009 24 2009 INSTALL OCCUPANCY SENSORS $550 $600 Implemented
MA0635 # 01 Y:2008 01 2008 USE MINIMUM SAFE OVEN VENTILATION $17,227 $51,900 Implemented
MA0635 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $21,303 $8,200 Implemented
MA0635 # 04 Y:2008 04 2008 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,922 $4,000 Implemented
MA0635 # 05 Y:2008 05 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $16,990 $27,590 Implemented
MA0635 # 06 Y:2008 06 2008 COVER OPEN TANKS $13,756 $53,000 Implemented
MA0635 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $10,446 $3,288 Implemented
MA0635 # 12 Y:2008 12 2008 USE MINIMUM SAFE OVEN VENTILATION $880 $500 Implemented
BD0315 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,369 $750 Implemented
BD0315 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $379 Implemented
LL0251 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $19,891 $2,392 Implemented
LL0251 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $6,369 $9,300 Implemented
LL0251 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $787 Implemented
UD0739 # 01 Y:2006 01 2006 CHANGE OPERATING CONDITIONS $41,626 $4,000 Implemented
UD0739 # 04 Y:2006 04 2006 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,397 $0 Implemented
UD0739 # 05 Y:2006 05 2006 CONDENSE OPERATION INTO ONE BUILDING $1,391 $30 Implemented
UD0739 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $1,049 $387 Implemented
UD0739 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $600 $0 Implemented
UD0739 # 10 Y:2006 10 2006 SHUT OFF PILOTS IN STANDBY EQUIPMENT $109 $0 Implemented
UD0739 # 11 Y:2006 11 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $104 $0 Implemented
IC0113 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $10,036 $0 Implemented
IC0113 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,683 $66,529 Implemented
IC0113 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,398 $8,517 Implemented