IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 331222 Steel Wire Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented
IC0084 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $105 $0 Implemented
IC0084 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,035 $400 Implemented
IC0084 # 04 Y:2004 04 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,809 $585 Implemented
IC0084 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $943 $582,998 Implemented
IC0084 # 08 Y:2004 08 2004 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $48,922 $200 Implemented
IC0084 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,469 $513 Implemented
IC0084 # 10 Y:2004 10 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $794 $5,100 Implemented
IC0084 # 11 Y:2004 11 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $122 $0 Implemented
IC0084 # 13 Y:2004 13 2004 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $197 $240 Implemented
UF0342 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,148 $0 Implemented
BD0253 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,484 $13,260 Implemented
BD0253 # 03 Y:2004 03 2004 INSTALL AUTOMATIC STACK DAMPER $2,979 $5,500 Implemented
BD0253 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,360 $1,275 Implemented
BD0253 # 08 Y:2004 08 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,816 $2,400 Implemented
BD0253 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,561 $385 Implemented
BD0253 # 15 Y:2004 15 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $754 $500 Implemented
BD0253 # 16 Y:2004 16 2004 PURCHASE APPROPRIATELY SIZED MATERIAL $8,820 $144 Implemented
MS0239 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,196 $17,859 Implemented
MS0239 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,584 $15,350 Implemented
MS0239 # 05 Y:2003 05 2003 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,265 $6,000 Implemented
MS0239 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,839 $1,000 Implemented
BD0240 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $16,799 $33,005 Implemented