IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

310

matching recommendations
Reset
NAICS 3313 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0716 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,967 $10,000 Implemented
OR0716 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $96,953 $165,004 Implemented
AS0458 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $229,273 $13,000 Implemented
SU0464 # 02 Y:2018 02 2018 INSULATE FEEDWATER TANK $637 $386 Implemented
SU0464 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,546 $73,000 Implemented
SU0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $740 Implemented
SU0464 # 07 Y:2018 07 2018 RECOVER WASTE HEAT FROM EQUIPMENT $93,805 $187,500 Implemented
SU0464 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $780 Implemented
OR0684 # 02 Y:2017 02 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,412 $20,340 Implemented
OR0684 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,832 $670 Implemented
OR0684 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,474 $8,100 Implemented
OR0684 # 06 Y:2017 06 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $229,046 $405,000 Implemented
OR0684 # 07 Y:2017 07 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $41,279 $86,043 Implemented
OR0683 # 01 Y:2017 01 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,831 $19,940 Implemented
OR0683 # 03 Y:2017 03 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,107 $670 Implemented
NC0572 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,293 $35,726 Implemented
NC0572 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $944 $200 Implemented
NC0572 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $21,764 Implemented
UA0159 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,382 $2,400 Implemented
UA0159 # 06 Y:2016 06 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $82,252 $55 Implemented
AM0692 # 06 Y:2015 06 2015 USE SYNTHETIC LUBRICANT $1,560 $0 Implemented
AM0692 # 08 Y:2015 08 2015 DISCONNECT BALLASTS $533 $1,100 Implemented
AM0692 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $6 Implemented
AM0692 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,115 $0 Implemented
AM0692 # 09 Y:2015 09 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $480 $10 Implemented