IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

775

matching recommendations
Reset
NAICS 3313 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0159 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,382 $2,400 Implemented
UA0159 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219,290 $1,047,803 Not Implemented
UA0159 # 06 Y:2016 06 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $82,252 $55 Implemented
UA0159 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,391 $20,000 Not Implemented
UA0159 # 08 Y:2016 08 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $88,918 $2,750 Not Implemented
AM0692 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,970 $10,000 Implemented
AM0692 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,830 $5,000 Implemented
AM0692 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,880 $16,750 Implemented
AM0692 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,124 $0 Implemented
AM0692 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,115 $0 Implemented
AM0692 # 06 Y:2015 06 2015 USE SYNTHETIC LUBRICANT $1,560 $0 Implemented
AM0692 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $6 Implemented
AM0692 # 08 Y:2015 08 2015 DISCONNECT BALLASTS $533 $1,100 Implemented
AM0692 # 09 Y:2015 09 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $480 $10 Implemented
UK1508 # 01 Y:2015 01 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $911 $290 Not Implemented
UK1508 # 02 Y:2015 02 2015 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,085 $9,000 Not Implemented
UK1508 # 03 Y:2015 03 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,758 $63,200 Not Implemented
UK1508 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,550 $15,020 Not Implemented
UK1508 # 05 Y:2015 05 2015 ADD AREA LIGHTING SWITCHES $909 $785 Not Implemented
UK1508 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $2,923 $7,872 Not Implemented
UK1508 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,722 $193 Implemented
UK1508 # 08 Y:2015 08 2015 UPGRADE OBSOLETE EQUIPMENT $1,302 $746 Implemented
UK1508 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $716 $0 Not Implemented
UK1508 # 10 Y:2015 10 2015 INSTALL COMMON HEADER ON COMPRESSORS $4,650 $2,950 Implemented
UK1508 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,700 $1,700 Implemented