IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 331315 Aluminum Sheet, Plate, and Foil Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0716 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,971 $1,200 Implemented
OR0716 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,289 $1,500 Implemented
OR0716 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,967 $10,000 Implemented
OR0716 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $96,953 $165,004 Implemented
WV0496 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,130 $680 Implemented
WV0496 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $2,182 $976 Implemented
WV0496 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,604 $0 Implemented
WV0496 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,669 $1,000 Implemented
WV0496 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,258 $1,700 Implemented
WV0496 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $23,310 $0 Implemented
MZ0120 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $4,675 $1,100 Implemented
MZ0120 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $153 $190 Implemented
MZ0120 # 03 Y:2013 03 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,557 $31,200 Implemented
MZ0120 # 01 Y:2013 01 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,136 $119,770 Implemented
MZ0089 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $50,074 $11,000 Implemented
MZ0089 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,426 $1,160 Implemented
MZ0089 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,384 $8,860 Implemented
MZ0089 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,314 $1,810 Implemented
SU0275 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,827 $0 Implemented
SU0275 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,818 $800 Implemented
SU0275 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $2,108 $155 Implemented
SU0275 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $292,552 $333,015 Implemented
SU0275 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $357 $1,608 Implemented
LE0272 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,361 $272 Implemented