IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

455

matching recommendations
Reset
NAICS 331318 Other Aluminum Rolling, Drawing, and Extruding
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0504 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $1,537 $556 Implemented
WV0504 # 09 Y:2015 09 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,530 $1,000 Not Implemented
WV0504 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $293 $69 Implemented
UM0454 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $2,000 Not Implemented
UM0454 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,291 $14,700 Not Implemented
UM0454 # 03 Y:2015 03 2015 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,130 $1,710 Implemented
UM0454 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,892 $4,500 Not Implemented
UM0454 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,354 $1,000 Not Implemented
UMS013 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $320,000 $600,000 Not Implemented
UMS013 # 02 Y:2012 02 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $106,000 $200,000 Not Implemented
UMS013 # 03 Y:2012 03 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $673,000 $1,000,000 Not Implemented
UMS013 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $465,000 $700,000 Not Implemented
UMS013 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $137,000 $0 Not Implemented
TT0095 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,067 $8,672 Not Implemented
TT0095 # 01 Y:2012 01 2012 REPLACE BOILER $8,685 $5,000 Implemented
TT0095 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $165,758 $300,000 Not Implemented
TT0095 # 03 Y:2012 03 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $9,681 $50,000 Not Implemented
TT0095 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $1,770 $1,195 Implemented
TT0095 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,668 $7,000 Implemented
TT0095 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $190 $10 Not Implemented
TT0095 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,751 $33,080 Implemented
TT0095 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $538 $625 Not Implemented
GT0888 # 01 Y:2012 01 2012 USE SYNTHETIC LUBRICANT $32,596 $0 Not Implemented
GT0888 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $0 Not Implemented
GT0888 # 03 Y:2012 03 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,563 $2,250 Not Implemented