Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
460
matching recommendationsNAICS | 331318 | Other Aluminum Rolling, Drawing, and Extruding |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0504 # 03 Y:2015 | 03 | 2015 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,770 | $5,240 | Not Implemented |
WV0504 # 04 Y:2015 | 04 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,984 | $500 | Implemented |
WV0504 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,624 | $12 | Implemented |
WV0504 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,334 | $486 | Implemented |
WV0504 # 07 Y:2015 | 07 | 2015 | INSTALL SET-BACK TIMERS | $1,890 | $1,060 | Not Implemented |
WV0504 # 08 Y:2015 | 08 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,537 | $556 | Implemented |
WV0504 # 09 Y:2015 | 09 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,530 | $1,000 | Not Implemented |
WV0504 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $293 | $69 | Implemented |
UM0454 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,028 | $2,000 | Not Implemented |
UM0454 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,291 | $14,700 | Not Implemented |
UM0454 # 03 Y:2015 | 03 | 2015 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,130 | $1,710 | Implemented |
UM0454 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $13,892 | $4,500 | Not Implemented |
UM0454 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,354 | $1,000 | Not Implemented |
UMS013 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $320,000 | $600,000 | Not Implemented |
UMS013 # 02 Y:2012 | 02 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $106,000 | $200,000 | Not Implemented |
UMS013 # 03 Y:2012 | 03 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $673,000 | $1,000,000 | Not Implemented |
UMS013 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $465,000 | $700,000 | Not Implemented |
UMS013 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $137,000 | $0 | Not Implemented |
TT0095 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $165,758 | $300,000 | Not Implemented |
TT0095 # 03 Y:2012 | 03 | 2012 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $9,681 | $50,000 | Not Implemented |
TT0095 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $1,770 | $1,195 | Implemented |
TT0095 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,668 | $7,000 | Implemented |
TT0095 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $190 | $10 | Not Implemented |
TT0095 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $39,751 | $33,080 | Implemented |
TT0095 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $625 | Not Implemented |