Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
594
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0375 # 18 Y:2008 | 18 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,797 | $10,125 | Implemented |
WV0375 # 19 Y:2008 | 19 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,275 | $0 | Not Implemented |
MA0630 # 01 Y:2008 | 01 | 2008 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $29,594 | $49,500 | Not Implemented |
MA0630 # 02 Y:2008 | 02 | 2008 | USE EXISTING DAM TO GENERATE ELECTRICITY | $22,703 | $72,000 | Not Implemented |
MA0630 # 03 Y:2008 | 03 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,565 | $2,000 | Implemented |
MA0630 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $639 | $300 | Implemented |
MA0630 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $407 | $1,944 | Not Implemented |
MA0630 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $189 | $1,300 | Implemented |
SF0349 # 01 Y:2007 | 01 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $6,853 | $0 | Implemented |
SF0349 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,603 | $150 | Not Implemented |
SF0349 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $0 | Implemented |
SF0349 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,139 | $10,019 | Not Implemented |
SF0349 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $3,490 | $1,992 | Implemented |
SF0349 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $725 | $757 | Implemented |
SF0349 # 07 Y:2007 | 07 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,644 | $8,646 | Not Implemented |
SF0349 # 08 Y:2007 | 08 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,042 | $2,339 | Not Implemented |
SF0349 # 09 Y:2007 | 09 | 2007 | COVER OPEN TANKS | $12,984 | $14,940 | Not Implemented |
SF0349 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,554 | $4,281 | Implemented |
SF0349 # 11 Y:2007 | 11 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,597 | $52,080 | Not Implemented |
SF0349 # 12 Y:2007 | 12 | 2007 | USE PHOTOCELL CONTROLS | $3,302 | $9,569 | Implemented |
SF0349 # 13 Y:2007 | 13 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $980 | Not Implemented |
SF0349 # 14 Y:2007 | 14 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,454 | $11,000 | Not Implemented |
SF0349 # 15 Y:2007 | 15 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,751 | $37,915 | Not Implemented |
MZ0007 # 01 Y:2007 | 01 | 2007 | COVER OPEN TANKS | $2,560 | $0 | Implemented |
MZ0007 # 02 Y:2007 | 02 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,000 | $20,000 | Not Implemented |