IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

585

matching recommendations
Reset
NAICS 3314 Nonferrous Metal (except Aluminum) Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0180 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $291 $680 Implemented
AM0454 # 01 Y:2004 01 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,550 $0 Not Implemented
AM0454 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,440 $200 Not Implemented
AM0454 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $840 Not Implemented
AM0454 # 04 Y:2004 04 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $630 $400 Not Implemented
AM0454 # 05 Y:2004 05 2004 $1,920 $0 Not Implemented
LE0176 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $114,214 $25,000 Implemented
LE0176 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $20,766 $1,500 Not Implemented
LE0176 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,851 $1,000 Not Implemented
LE0176 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,480 $5,000 Not Implemented
LE0176 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,003 $1,000 Implemented
LE0176 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,825 $0 Implemented
LE0176 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $985 $0 Not Implemented
CO0529 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,400 $7,000 Implemented
CO0529 # 02 Y:2003 02 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,520 $5,060 Not Implemented
CO0529 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,790 $16,530 Not Implemented
CO0529 # 04 Y:2003 04 2003 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,810 $3,920 Implemented
CO0529 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,090 $190 Implemented
CO0529 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,240 $4,000 Not Implemented
CO0529 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $386 $128 Implemented
CO0529 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $218 $250 Implemented
CO0529 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $460 $1,440 Not Implemented
MA0537 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $94,545 $112,240 Not Implemented
MA0537 # 02 Y:2003 02 2003 $61,752 $240,000 Not Implemented
MA0537 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,180 $8,000 Not Implemented