Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsNAICS | 33141 | Nonferrous Metal (except Aluminum) Smelting and Refining |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0197 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $10,402 | $8,241 | Implemented |
IC0197 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,986 | $2,550 | Not Implemented |
IC0197 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,402 | $12,724 | Not Implemented |
SF0468 # 01 Y:2015 | 01 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $3,541 | $0 | Implemented |
SF0468 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,328 | $0 | Not Implemented |
SF0468 # 03 Y:2015 | 03 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,761 | $0 | Implemented |
SF0468 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,358 | $455 | Not Implemented |
SF0468 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,141 | $1,658 | Implemented |
SF0468 # 06 Y:2015 | 06 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,031 | $8,158 | Implemented |
SF0468 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $356 | $274 | Implemented |
SF0468 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $2,043 | $1,679 | Implemented |
SF0468 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,506 | $8,348 | Implemented |
SF0468 # 10 Y:2015 | 10 | 2015 | REPLACE BOILER | $9,878 | $51,914 | Implemented |
OR0644 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $456,074 | $95,650 | Not Implemented |
OR0644 # 02 Y:2015 | 02 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $122,402 | $38,517 | Not Implemented |
OR0644 # 03 Y:2015 | 03 | 2015 | ELIMINATE/REDUCE AN OPERATION | $106,634 | $72,750 | Implemented |
OR0644 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $37,274 | $20,400 | Implemented |
OR0644 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,431 | $1,600 | Not Implemented |
OR0644 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $3,865 | Implemented |
UM0435 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,450 | $4,500 | Implemented |
UM0435 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,500 | $200 | Not Implemented |
UM0435 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $966 | $2,500 | Implemented |
UM0435 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,000 | $3,000 | Implemented |
WV0436 # 01 Y:2011 | 01 | 2011 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $62,911 | $74,268 | Not Implemented |
WV0436 # 02 Y:2011 | 02 | 2011 | OPTIMIZE PLANT POWER FACTOR | $32,243 | $22,700 | Not Implemented |