Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
246
matching recommendationsNAICS | 33142 | Copper Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0188 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $191,070 | $2,400 | Not Implemented |
IP0188 # 02 Y:2024 | 02 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $27,927 | $2,500 | Not Implemented |
IP0188 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,621 | $438 | Not Implemented |
IP0188 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,671 | $49 | Not Implemented |
IP0188 # 03 Y:2024 | 03 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,000 | $650 | Not Implemented |
IP0188 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,293 | $2,560 | Not Implemented |
IP0188 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,737 | $750 | Not Implemented |
IP0188 # 09 Y:2024 | 09 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $1,660 | $947 | Not Implemented |
IP0188 # 08 Y:2024 | 08 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $4,200 | $5,429 | Not Implemented |
IP0184 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,142 | $12,019 | Implemented |
IP0184 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,216 | $17,960 | Implemented |
IP0184 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,667 | $2,615 | Implemented |
IP0184 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $83,429 | $20,365 | Implemented |
IP0184 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,493 | $0 | Implemented |
SD0643 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $489 | $250 | Implemented |
SD0643 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $338 | $424 | Implemented |
SD0643 # 08 Y:2024 | 08 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,956 | $2,000 | Not Implemented |
SD0643 # 05 Y:2024 | 05 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,058 | $4,196 | Not Implemented |
SD0643 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,390 | $0 | Not Implemented |
SD0643 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM TEMPERATURE | $6,846 | $0 | Implemented |
SD0643 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,833 | $125,021 | Not Implemented |
SD0643 # 06 Y:2024 | 06 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $6,190 | $4,926 | Not Implemented |
UC2308 # 02 Y:2023 | 02 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,561 | $0 | Implemented |
UC2308 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,353 | $987 | Implemented |
UC2308 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $204,687 | $50,000 | Implemented |