matching recommendationsNAICS | 33142 | Copper Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0188 # 09 Y:2024 | 09 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $1,660 | $947 | Not Implemented |
IP0188 # 08 Y:2024 | 08 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $4,200 | $5,429 | Not Implemented |
IP0188 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,671 | $49 | Not Implemented |
IP0188 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,621 | $438 | Not Implemented |
IP0188 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,737 | $750 | Not Implemented |
IP0188 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,293 | $2,560 | Not Implemented |
IP0188 # 03 Y:2024 | 03 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,000 | $650 | Not Implemented |
IP0188 # 02 Y:2024 | 02 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $27,927 | $2,500 | Not Implemented |
IP0188 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $191,070 | $2,400 | Not Implemented |
IP0184 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,493 | $0 | Implemented |
IP0184 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $83,429 | $20,365 | Implemented |
IP0184 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,667 | $2,615 | Implemented |
IP0184 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,216 | $17,960 | Implemented |
IP0184 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,142 | $12,019 | Implemented |
IP0074 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,888 | $292 | Implemented |
IP0074 # 10 Y:2016 | 10 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $147,202 | $313,184 | Not Implemented |
IP0074 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,616 | $56,725 | Implemented |
IP0074 # 08 Y:2016 | 08 | 2016 | APPLY FOR INVESTMENT INCENTIVES | $6,707 | $5,000 | Implemented |
IP0074 # 07 Y:2016 | 07 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $20,689 | $4,600 | Not Implemented |
IP0074 # 06 Y:2016 | 06 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $473 | $101 | Implemented |
IP0074 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,366 | $308 | Implemented |
IP0074 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,398 | $951 | Implemented |
IP0074 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $833 | $4 | Not Implemented |
IP0074 # 01 Y:2016 | 01 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $6,256 | $0 | Not Implemented |
UD0721 # 01 Y:2005 | 01 | 2005 | RECOVER MECHANICAL ENERGY | $206,969 | $413,938 | Implemented |