Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
246
matching recommendationsNAICS | 331420 | Copper Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0121 # 13 Y:2013 | 13 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $209 | $400 | Not Implemented |
LE0349 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,018 | $7,190 | Implemented |
LE0349 # 02 Y:2012 | 02 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $85,383 | $310,000 | Implemented |
LE0349 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,249 | $40 | Not Implemented |
LE0349 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,253 | $1,248 | Not Implemented |
LE0349 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,373 | $1,080 | Implemented |
LE0349 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,052 | $200 | Implemented |
LE0349 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,510 | $12,700 | Not Implemented |
LE0349 # 08 Y:2012 | 08 | 2012 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,074 | $5,200 | Not Implemented |
OK0834 # 01 Y:2012 | 01 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,800 | $0 | Implemented |
OK0834 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,600 | $18,285 | Not Implemented |
OK0834 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,900 | $900 | Not Implemented |
OK0834 # 04 Y:2012 | 04 | 2012 | KEEP BOILER TUBES CLEAN | $810 | $500 | Implemented |
OK0834 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $1,500 | Implemented |
OK0834 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,509 | $2,000 | Not Implemented |
OK0834 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,772 | $13,200 | Not Implemented |
OK0834 # 08 Y:2012 | 08 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $4,641 | $0 | Implemented |
OK0834 # 09 Y:2012 | 09 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,100 | $0 | Not Implemented |
SU0315 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,327 | $0 | Not Implemented |
SU0315 # 02 Y:2012 | 02 | 2012 | RECOVER AND REUSE SPENT ACID BATHS | $28,847 | $792 | Not Implemented |
SU0315 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,269 | $1,357 | Not Implemented |
SU0315 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $317 | $140 | Not Implemented |
SU0315 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $149 | $652 | Not Implemented |
SU0315 # 06 Y:2012 | 06 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $33,502 | $167,290 | Not Implemented |
SU0315 # 07 Y:2012 | 07 | 2012 | OPTIMIZE PLANT POWER FACTOR | $8,366 | $42,403 | Not Implemented |