IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

863

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0362 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $12,000 Implemented
IP0010 # 01 Y:2013 01 2013 APPLY FOR INVESTMENT INCENTIVES $4,545 $0 Implemented
IP0010 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,822 $0 Implemented
IP0010 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $446 $0 Implemented
IP0010 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,962 $107 Implemented
IP0010 # 07 Y:2013 07 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $571 $221 Implemented
IP0010 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,108 $1,795 Implemented
IP0010 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,469 $15,876 Implemented
IP0010 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $2,850 $8,526 Implemented
LE0354 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,533 $21 Implemented
LE0354 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $459 $42 Implemented
LE0353 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,972 $8,105 Implemented
LE0353 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $3,495 Implemented
LE0353 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,998 $11,700 Implemented
LE0353 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,843 $520 Implemented
LE0353 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,835 $1,000 Implemented
LE0353 # 08 Y:2013 08 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,196 $2,200 Implemented
MZ0095 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $640 Implemented
MZ0095 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $5,290 Implemented
MZ0095 # 03 Y:2012 03 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $688 $0 Implemented
UD0861 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,708 $0 Implemented
UD0861 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,025 $0 Implemented
UD0861 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $1,371 $3,440 Implemented
UD0861 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,167 $0 Implemented
UD0861 # 07 Y:2012 07 2012 UPGRADE CONTROLS ON COMPRESSORS $14,934 $2,000 Implemented