IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

317

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0127 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,199 $33,933 n/a
CW0127 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,576 $56,000 n/a
CW0127 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0127 # 03 Y:2023 03 2023 RECYCLE CASTING SAND $414,227 $38,394 n/a
CW0127 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $21,648 n/a
CW0127 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $9,906 $19,900 n/a
UD1040 # 01 Y:2022 01 2022 COVER OPEN TANKS $3,104 $0 Not Implemented
UD1040 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,896 $453 Not Implemented
UD1040 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $8,723 $0 Not Implemented
UD1040 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $13,562 $11,900 Not Implemented
UD1040 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,768 $58,100 Not Implemented
UD1040 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $45,386 $62,689 Not Implemented
UD1040 # 04 Y:2022 04 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $78,304 $700 Not Implemented
UD1040 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $146,536 $40,000 Not Implemented
UD1040 # 10 Y:2022 10 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,313 $0 Not Implemented
UD1040 # 09 Y:2022 09 2022 REDUCE VENTILATION AIR $201,271 $872,653 Not Implemented
UD0992 # 03 Y:2018 03 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $30,337 $32,600 Not Implemented
UD0992 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,245 $700 Implemented
UD0992 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,815 $0 Not Implemented
UD0992 # 02 Y:2018 02 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $48,158 $1,000 Not Implemented
UD0992 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,174 $9,900 Not Implemented
UD0989 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,291 $1,000 Not Implemented
UD0989 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,033 $0 Not Implemented
UD0989 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,885 $6,000 Not Implemented
UD0989 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,362 $1,935 Not Implemented