IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0824 # 01 Y:2010 01 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $48,864 $143,000 Not Implemented
UD0824 # 02 Y:2010 02 2010 INSTALL WIND POWERED ELECTRIC GENERATOR $1,443,350 $3,000,000 Not Implemented
UD0824 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,706 $15,238 Not Implemented
UD0824 # 04 Y:2010 04 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,478 $10,195 Not Implemented
UD0824 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,762 $6,380 Not Implemented
UD0824 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,468 $4,640 Not Implemented
UD0824 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,897 $20 Not Implemented
UD0824 # 08 Y:2010 08 2010 UPGRADE CONTROLS ON COMPRESSORS $81,554 $20,000 Not Implemented
UD0824 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49,948 $16,000 Not Implemented
UD0824 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,595 $1,500 Not Implemented
UD0824 # 11 Y:2010 11 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,160 $2,000 Not Implemented
UD0824 # 12 Y:2010 12 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $486 $540 Not Implemented
UD0824 # 13 Y:2010 13 2010 COVER OPEN TANKS $80,740 $1,600 Not Implemented
UD0824 # 14 Y:2010 14 2010 INSULATE BARE EQUIPMENT $61,285 $5,152 Not Implemented
UD0824 # 15 Y:2010 15 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $43,001 $1,243,001 Not Implemented
UD0824 # 16 Y:2010 16 2010 INSTALL AUTOMATIC STACK DAMPER $22,399 $500 Not Implemented
UD0824 # 17 Y:2010 17 2010 COVER OPEN TANKS $8,613 $17,226 Not Implemented
UD0824 # 18 Y:2010 18 2010 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,106 $36,212 Not Implemented
UD0824 # 19 Y:2010 19 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,081 $11,700 Not Implemented
UD0824 # 20 Y:2010 20 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,372 $11,000 Not Implemented
SU0298 # 01 Y:2010 01 2010 PAY BILLS ON TIME TO AVOID LATE FEES $21,457 $0 Not Implemented
SU0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,096 $0 Not Implemented
SU0298 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,218 $1,248 Not Implemented
SU0298 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $431 $86 Not Implemented
SU0298 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $266 Not Implemented