IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,988

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0180 # 10 Y:2022 10 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $771 $2,000 Implemented
WM0180 # 09 Y:2022 09 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,067 $4,100 Not Implemented
WM0180 # 08 Y:2022 08 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,804 $0 Implemented
WM0180 # 07 Y:2022 07 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,006 $0 Implemented
WM0180 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,388 $0 Not Implemented
WM0180 # 05 Y:2022 05 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,714 $0 Not Implemented
WM0180 # 04 Y:2022 04 2022 USE SYNTHETIC LUBRICANT $2,843 $4,510 Implemented
WM0180 # 03 Y:2022 03 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,931 $8,560 Implemented
UD1040 # 10 Y:2022 10 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,313 $0 Not Implemented
UD1040 # 09 Y:2022 09 2022 REDUCE VENTILATION AIR $201,271 $872,653 Not Implemented
UD1040 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,768 $58,100 Not Implemented
UD1040 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $13,562 $11,900 Not Implemented
UD1040 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $45,386 $62,689 Not Implemented
UD1040 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $146,536 $40,000 Not Implemented
UD1040 # 04 Y:2022 04 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $78,304 $700 Not Implemented
UD1040 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $8,723 $0 Not Implemented
UD1040 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,896 $453 Not Implemented
UD1040 # 01 Y:2022 01 2022 COVER OPEN TANKS $3,104 $0 Not Implemented
WM0179 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,169 $43,950 Not Implemented
WM0179 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,270 $3,192 Implemented
WM0179 # 03 Y:2022 03 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,096 $350 Implemented
WM0179 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,765 $1,590 Implemented
WM0179 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,335 $3,320 Implemented
WM0179 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,377 $1,500 Implemented
WM0179 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,367 $0 Not Implemented