IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0336 # 03 Y:2008 03 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,866 $29,119 Not Implemented
UM0336 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,116 $200 Implemented
UM0336 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,330 $1,650 Implemented
UD0773 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $79,805 $20,000 Implemented
UD0773 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,919 $21,000 Not Implemented
UD0773 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $22,200 $15,000 Implemented
UD0773 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $16,500 $30,000 Not Implemented
UD0773 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,532 $9,125 Not Implemented
UD0773 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,125 $26,824 Not Implemented
UD0773 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,990 $0 Implemented
UD0773 # 08 Y:2008 08 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,322 $500 Not Implemented
UD0773 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,733 $0 Not Implemented
UA0013 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,423 $700 Implemented
UA0013 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,905 $0 Not Implemented
UA0013 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,315 $47,838 Implemented
UA0013 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $17,411 $13,088 Implemented
UA0013 # 05 Y:2007 05 2007 USE OPTIMUM THICKNESS INSULATION $3,027 $279 Not Implemented
UA0013 # 06 Y:2007 06 2007 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,112 $6,898 Not Implemented
UA0013 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,856 $0 Implemented
UM0330 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $17,750 $12,000 Not Implemented
UM0330 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,366 $5,250 Not Implemented
UM0330 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $1,775 $516 Not Implemented
UM0330 # 04 Y:2007 04 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,732 $1,300 Not Implemented
UM0330 # 05 Y:2007 05 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,605 $500 Not Implemented
UM0330 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,228 $4,500 Not Implemented