IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0295 # 06 Y:2004 06 2004 COVER OPEN TANKS $1,229 $2,250 Implemented
WV0295 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $300 Implemented
WV0295 # 08 Y:2004 08 2004 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $30,991 $1,500 Not Implemented
WV0295 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $775 $60 Implemented
WV0295 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $654 $210 Not Implemented
WV0295 # 11 Y:2004 11 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $604 $1,000 Not Implemented
WV0295 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $0 Implemented
WV0295 # 13 Y:2004 13 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $150 Not Implemented
WV0295 # 14 Y:2004 14 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $245 $165 Implemented
WI0469 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $14,400 Not Implemented
WI0469 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,071 $0 Implemented
WI0469 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $626 $0 Implemented
WI0469 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $588 $249 Implemented
WI0469 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $463 $640 Not Implemented
WI0469 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $107 Implemented
OK0688 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,973 $0 Not Implemented
OK0688 # 02 Y:2004 02 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,034 $2,400 Implemented
OK0688 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $7,575 $3,782 Implemented
OK0688 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,211 $535 Implemented
OK0688 # 05 Y:2004 05 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,882 $3,690 Implemented
OK0688 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $763 $5,444 Not Implemented
OK0688 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $464 $745 Not Implemented
OK0688 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,846 Implemented
MA0553 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,580 $20,000 Not Implemented
MA0553 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,555 $15,605 Implemented