IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0127 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $444 $240 Not Implemented
BS0127 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,465 $10,665 Not Implemented
BS0127 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,969 $1,830 Not Implemented
BS0127 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,701 $2,200 Not Implemented
BS0127 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,941 $9,000 Not Implemented
BS0127 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,976 $50 Not Implemented
BS0094 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,969 $390 Not Implemented
BS0094 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,142 $30,425 Implemented
BS0094 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,740 $120 Implemented
BS0065 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,229 $46,340 Implemented
BS0065 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,215 $10,715 Not Implemented
BS0065 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,088 $160 Implemented
BS0065 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $148 $15 Implemented
UW0052 # 01 Y:2011 01 2011 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $43,653 $0 Not Implemented
UW0052 # 04 Y:2011 04 2011 USE RADIANT HEATER FOR SPOT HEATING $10,330 $10,000 Not Implemented
UW0052 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $22,100 $0 Not Implemented
UW0052 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,448 $326,103 Not Implemented
UW0018 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $4,328 Not Implemented
UW0018 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,037 $2,775 Not Implemented
UW0018 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $9,391 $39,900 Not Implemented
UW0018 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,434 $34,000 Not Implemented
UW0018 # 01 Y:2008 01 2008 $55,734 $72,000 Not Implemented
OR0509 # 02 Y:2006 02 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $58,000 $6,800 Implemented
OR0509 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $3,000 $1,200 Not Implemented
OR0509 # 07 Y:2006 07 2006 UPGRADE CONTROLS ON COMPRESSORS $7,000 $11,000 Implemented